Whole-home Cabinetry
One cabinet schedule for the whole home.
Organise the kitchen, wardrobes, entry, media storage and utility cabinets as one coordinated project.

Decisions to make early
Settle these before the drawings are final.
Build a room schedule
Give each cabinet run a room and reference. Note quantities, dimensions and any missing site information.
Repeat a finish with intent
Identify where colour and grain should match, and where a different finish serves a practical need.
Plan handovers by room
Confirm sockets, wall changes, installation sequence and how packed items will be identified.
Completed residence · studyCoordinate what repeats
One physical reference for each finish.
Approve one sample for each finish family, then record exceptions by room before production.
| Ref | Room | Cabinet run | Finish family |
|---|---|---|---|
| E01 | Entry | Shoe and coat cabinet with display niche | Oak A |
| K01 | Kitchen | Tall units, sink run and island | Oak A Paint B |
| L01 | Living | Media wall and display shelving | Oak A |
| W01 | Main bedroom | Walk-in wardrobe with drawers | Paint B |
| S01 | Study | Desk, wall cabinets and open shelves | Oak A |
| U01 | Utility | Tall cabinets around washer and dryer | Laminate C |
Illustrative schedule. Each run gets a reference that follows it from drawing to carton label.


Gallery
Built-ins across the house.








What to put in your brief
Give every quote the same starting point.
Mark unmeasured dimensions as approximate. Confirm the final scope before a quotation or production approval.
- Room list with a reference for every cabinet run.
- Plans or elevations for each room, with dimensions marked as measured or approximate.
- Finish families: which rooms share door colour, grain or edge detail.
- Site information: sockets, wall changes and installation sequence.
- Destination and timing, including any phased delivery.