Cartons labelled by cabinet reference on a pallet

Order support

Keep the specification visible through delivery.

Agree what our team, the supplier and the freight partner will do before placing an order.

Cabinet workshop · Foshan

What to agree at each stage

Four stages, agreed up front.

01

Before production

  • Final drawings signed off on one revision.
  • Approved samples recorded with identifiers.
  • Schedule and references agreed for every cabinet run.
02

During production

  • Agreed progress updates and photos.
  • Changes recorded with the affected cabinet reference.
  • Questions resolved against the approved drawing.
03

Before dispatch

  • Inspection against the schedule, samples and drawings.
  • Packing and labels matched to the packing list.
  • Release once exceptions are closed.
04

After delivery

  • Unpacking check by reference and room.
  • Any damage or shortage photographed and reported.
  • Follow-up handled as agreed in the order terms.
Checking the interior of a cabinet box on the floor
Buyer visit · Foshan, Nov 2026
Wrapped and boxed panels on a roller line
Cabinet workshop · Foshan

If something changes

Record it against the cabinet.

Record the affected cabinet reference, photos and the proposed correction. Agree who approves the change and when it can be checked again.